Client
Malincross Ltd.
Location
Clonard, Balbriggan, Co. Dublin
Services Provided
Civil / Structural Engineering Services & PSDP
Construction value:
€1m
Project Description
This project involves the detailed design and construction of 0.4km of new link road at Balbriggan, Co. Dublin. The road will serve a new urban fringe area in Balbriggan which was part of the Stephenstown, Clogheder, Clonard LAP lands. The road will serving schools and further residential development. The project is to be delivered in 2 Phases. The road consists of a 6.5m wide road with 1.0m grass verge, 1.5m cycle track, 1.5m wide footpaths. The works in Phase 1 also included a tying into the existing Stephenstown Link Road and also the construction of a segmental retaining wall to create a reinforced earth retaining structure up to 3.5m high.
The project also included all utility services covering power, comms, street lights, storm, foul and water main services. MPA provided tender / construction design as well as post planning compliance, taking in charge and PSDP services. Included in the projects are all necessary SuDS measure including, downstream defenders, petrol interceptors and attenuation tanks, along with connections to main sewers.